US RE49,767 E1
Switch-timing in a switched-capacitor power converter
Gregory Szczeszynski, Hollis, NH (US); David M. Giuliano, San Diego, CA (US); and Raymond Barrett, Jr., Merrimack, NH (US)
Assigned to PSEMI CORPORATION, San Diego, CA (US)
Filed by pSemi Corporation, San Diego, CA (US)
Filed on Aug. 6, 2021, as Appl. No. 17/396,023.
Application 16/146,086 is a continuation in part of application No. 13/837,796, filed on Mar. 15, 2013, granted, now 8,724,353, issued on May 13, 2014.
Application 17/396,023 is a reissue of application No. 16/146,086, filed on Sep. 28, 2018, granted, now 10,374,512, issued on Aug. 6, 2019.
Int. Cl. H02M 3/07 (2006.01); H02M 1/08 (2006.01)
CPC H02M 3/073 (2013.01) [H02M 1/08 (2013.01)] 41 Claims
OG exemplary drawing
 
1. An apparatus comprising a switched-capacitor power-converter, wherein said switched-capacitor power-converter comprises an input, an output, a first plurality of switches, a second plurality of switches, and gate-driving circuits, each of which corresponds to a switch from said first plurality of switches, wherein each gate-driving circuit uses charge from a selected pump capacitor from a plurality of pump capacitors to operate a corresponding one of said switches from said first plurality of switches, wherein said first plurality of switches comprises a first switch, wherein said second plurality of switches comprises a second switch, wherein, during clocked operation of said switched-capacitor power-converter, said first plurality of switches transitions between different states, each of which corresponds to a particular interconnection of said pump capacitors, said pump capacitors including a first pump capacitor, wherein, during clocked operations, said first switch closes, thereby establishing a connection with said first pump capacitor, wherein, prior to said first switch closing, said second switch closes, wherein as a result of closure of said second switch, said first pump capacitor is pre-charged by the time said first switch closes.