CPC H04L 27/26132 (2021.01) [H04B 7/084 (2013.01); H04B 7/0837 (2013.01); H04B 7/10 (2013.01); H04B 7/15528 (2013.01); H04B 17/0085 (2013.01); H04B 17/309 (2015.01); H04L 1/08 (2013.01); H04L 1/1845 (2013.01); H04L 5/0048 (2013.01); H04L 5/0051 (2013.01); H04L 27/2613 (2013.01); H04W 24/06 (2013.01); H04L 5/005 (2013.01); H04W 72/542 (2023.01)] | 6 Claims |
1. An integrated circuit, comprising:
at least one input, which, in operation, inputs a signal; and
control circuitry coupled to the at least one input,
wherein,
in a first case in which the control circuitry performs a physical uplink shared channel (PUSCH) mapping of PUSCH repetition signals in a plurality of subframes, the control circuitry controls:
puncturing a part of the PUSCH repetition signals in a resource in a last single-carrier frequency-division multiple access (SC-FDMA) symbol of a sounding reference signal (SRS) transmission candidate subframe of the plurality of subframes, wherein the resource is counted for the PUSCH mapping of the PUSCH repetition signals; and
transmitting a remaining part of the PUSCH repetition signals apart from the punctured part of the PUSCH repetition signals, and
in a second case in which the control circuitry performs a physical uplink control channel (PUCCH) mapping of PUCCH repetition signals in a plurality of subframes and a frequency hopping of the PUCCH repetition signals every subset of subframes in the plurality of subframes, the control circuitry controls:
using a shortened PUCCH format in two or more SRS transmission candidate subframes of the plurality of subframes and using a normal PUCCH format in the plurality of subframes apart from the two or more SRS transmission candidate subframes, wherein if a number of subframes of the subset of subframes is less than a period between the two or more SRS transmission candidate subframes, a part of the PUCCH repetition signals for the subset of subframes is mapped to the period using the normal PUCCH format; and
transmitting the PUCCH repetition signals.
|