CPC G06Q 10/0631 (2013.01) [G06F 11/3006 (2013.01); G06F 17/18 (2013.01); G06Q 10/06395 (2013.01)] | 26 Claims |
1. A system for analyzing infrastructure operation data, the system comprising:
one or more processors; and
a memory coupled to the one or more processors, wherein the memory stores instructions executable by the one or more processors, wherein the one or more processors are programmed to execute the instructions to:
determine, by the one or more processors, a reference operation period, the reference operation period being a period in time for which the system is minimally operated in an operation period before a non-operation period;
detect, by the one or more processors, a state change of an infrastructure comprising a plurality of facility components, the state change of the infrastructure being determined based on operation states of one or more facility components of the plurality of facility components determined based on sensor data from corresponding sensors, wherein the one or more processors monitor the sensor data from the sensors each corresponding to an operating condition of a respective facility component to detect a change from a non-operation state to an operation state of the respective facility component;
determine, by the one or more processors, that the operation state continues over an operation period that is substantially equal to or longer than the reference operation period; and
start, based on detecting the state change of the infrastructure and the operation state continuing over the operation period that is substantially equal to or longer than the reference operation period, executing an analysis only on the operation data of the operation period that is substantially equal to or longer than the reference operation period,
wherein the one or more processors are configured to establish a start time to start the analysis and an end time to end the analysis based on the reference operation period, and
wherein the executing the analysis on the operation data comprises:
monitoring, by the one or more processors and based on the established start time and end time, the sensor data from the sensors corresponding to the one or more facility components to generate operation data of a first operation period and the sensor data from the sensors corresponding to the one or more facility components to generate operation data of a second operation period, the second operation period being a period of operation after the first operation period and after the non-operation period;
calculating statistics, by the one or more processors, for the operation data of the first operation period and the operation data of the second operation period; and
analyzing and determining a difference, by the one or more processors, between the operation data of the first operation period and the operation data of the second operation period based on the statistics.
|