CPC E21B 47/022 (2013.01) [E02D 27/52 (2013.01)] | 9 Claims |
1. A method of controlling the orientation of a well, the method comprising:
installing a well foundation, the foundation having a channel therethrough;
measuring an angle of the foundation relative to vertical;
providing a well insert, the well insert comprising a channel therethrough for the well; and
inserting the well insert into the channel in the installed well foundation,
wherein the well insert corrects for a misalignment of the channel in the well foundation from vertical after the foundation has been installed.
|