CPC E21B 43/12 (2013.01) [E21B 34/025 (2020.05); G05D 7/0623 (2013.01); E21B 47/06 (2013.01)] | 21 Claims |
1. A hydrocarbon well system comprising:
a smart choke valve system that is configured to regulate flow of production fluid from a wellbore of a hydrocarbon well, the smart choke valve system comprising:
a choke valve configured to operate at different choke settings to regulate the flow of production fluid from the wellbore;
a sand sensor configured to sense amounts of sand production in production fluid flowing through the choke valve; and
a choke valve control system configured to control operation of the choke valve, the choke valve control system configured to perform the following operations:
obtain, from a well control system of the hydrocarbon well:
a well profile for the well, the well profile comprising a sand production profile that defines a relationship of sand production of the hydrocarbon well to settings of the choke valve; and
a first choke setting;
control the choke valve to operate at the first choke setting;
determine, based on the well profile, a lower sand production threshold that is indicative of a minimum amount of sand production for the first choke setting;
determine, based on sand production measurements acquired by way of the sand sensor while the choke valve is operating at the first choke setting, a first amount of sand production of the well;
determine whether the first amount of sand production is below the lower sand production threshold; and
in response to determining that the first amount of sand production is below the lower sand production threshold:
determine, based on the well profile, a second choke setting that corresponds to a second production flowrate that is greater than a first production flowrate associated with the first choke setting; and
control, in response to determining the second choke setting, the choke valve to operate at the second choke setting.
|