| CPC E21B 19/087 (2013.01) [E21B 19/084 (2013.01); E21B 19/089 (2013.01)] | 21 Claims |

|
12. A method of deploying a catwalk system at a wellsite, comprising:
engaging a rig structure with a V-door ramp, the V-door ramp coupled to a counterbalance system comprising:
a first sheave suspended from the V-door ramp,
a second sheave independently suspended from the first sheave, and
a counterbalance rope wound at least partially about the first sheave and the second sheave, a first end of the counterbalance rope coupled to a trough at a coupling point;
actuating a main arm to slide the trough upward and along the V-door ramp toward the rig structure;
pulling the trough upward using the first end of the counterbalance rope while actuating the main arm;
positioning an outer end of the trough adjacent a platform of the rig structure; and
pulling the trough downward using the first end of the counterbalance rope.
|