| CPC G06F 3/0481 (2013.01) [G06F 3/0486 (2013.01); G06F 3/0488 (2013.01); G09B 19/00 (2013.01)] | 20 Claims |

|
1. A method of handling user interactions with a schedule interface in a daily routine optimization application, comprising:
detecting user selection of an activity on a clock-based interface;
allowing modification of the selected activity's timing or duration;
hiding lower priority activities during the modification process;
recalculating and redisplaying affected activities after the modification is complete.
|