| CPC E21B 43/01 (2013.01) [E21B 44/00 (2013.01)] | 18 Claims |

|
1. A method, comprising:
providing a well extending underground from a surface;
using radial drilling to drill a primary tunnel extending in an outwardly direction from the well at a first axial location along the well;
drilling a secondary tunnel extending from the well to a second axial location along the main well,
wherein the primary tunnel and the secondary tunnel are drilled within a non-producing area off the well;
installing a power source in the secondary tunnel;
installing a chemical storage assembly in the primary tunnel, wherein the chemical storage assembly comprises chemicals stored in the chemical storage assembly;
connecting the power source to the chemical storage assembly in the primary tunnel;
powering the chemical storage assembly via the power source; and
ejecting the chemicals from the chemical storage assembly into the well.
|