CPC H02K 15/03 (2013.01) [B25J 9/0084 (2013.01); B25J 11/005 (2013.01); H02K 1/276 (2013.01); Y10T 29/53313 (2015.01)] | 20 Claims |
1. A rotor assembly system for a manufacturing cell, the rotor assembly system comprising:
a central robotic system comprising:
a conveyor platform; and
a multi-axial central robot arranged on the conveyor platform, wherein:
the multi-axial central robot is configured to perform a set of manufacturing processes from among a plurality of rotor manufacturing processes related to at least one rotor component, and
the conveyor platform is operable to move the multi-axial central robot within the manufacturing cell to transfer the at least one rotor component between one or more rotor manufacturing processes from among the plurality of rotor manufacturing processes.
|