| CPC H04W 74/006 (2013.01) [H04W 72/0453 (2013.01); H04W 74/0808 (2013.01)] | 15 Claims |

|
1. A method for resource configuration, applied to a base station, the method comprising:
configuring a frame based equipment (FBE) parameter, wherein the FBE parameter comprises a first FBE parameter and a second FBE parameter, the first FBE parameter comprises an uplink frequency domain parameter indicating an uplink frequency domain resource for UE performing CCA, the second FBE parameter comprises a downlink frequency domain parameter indicating a downlink frequency domain resource for the base station performing CCA, wherein the uplink frequency domain resource and the downlink frequency domain resource respectively include different frequency bands with different communication frequencies.
|