| CPC H02J 7/0063 (2013.01) [H01T 15/00 (2013.01); H03K 21/08 (2013.01)] | 20 Claims |

|
1. A method, comprising:
receiving an input signal to configure a switching device in an ON condition, the switching device coupled in series with a coil;
starting a timer;
sensing a current in the coil after the switching device is configured in the ON condition;
measuring, based on the timer, a rise time corresponding to a time for the current to satisfy a criterion;
calculating a soft-shutdown delay based on the rise time; and
starting a soft-shutdown to reduce the current in the coil after the soft-shutdown delay.
|