| CPC G06Q 10/04 (2013.01) [C22B 3/06 (2013.01); C22B 15/0067 (2013.01); C22B 15/0095 (2013.01); G06Q 10/0631 (2013.01); G06Q 50/02 (2013.01)] | 18 Claims |

|
1. A method comprising:
determining, by one or more processors, a location of an estimated remaining amount of mineral in a section of a stockpile and the estimated remaining amount of mineral in the section of the stockpile;
generating, by the one or more processors, a prediction of an amount of mineral recovery from the estimated remaining amount of mineral at the location in the section of the stockpile;
generating, by the one or more processors, a mineral recovery curve to estimate an amount of mineral recovery from leaching over a period of time, by using the prediction of the amount of mineral recovery; and
activating, by the one or more processors and based on the mineral recovery curve, deep injection of raffinate at a depth to target the estimated remaining amount of mineral at the location in the section of the stockpile to implement the leaching over the period of time to achieve the estimated amount of the mineral recovery,
wherein the activating causes a drilling machine to drill holes at the depth to target the estimated remaining amount of mineral at the location in the section of the stockpile, and
wherein the activating causes a pumping machine to pump the raffinate to implement the leaching over the period of time to achieve the estimated amount of mineral recovery.
|