| CPC G01V 3/20 (2013.01) [G01V 3/38 (2013.01); G01V 3/36 (2013.01)] | 20 Claims |

|
1. A method comprising:
disposing a downhole tool into a borehole;
taking two or more measurements of the borehole with one or more pads disposed on the downhole tool;
creating two or more images from the two or more measurements to form an image log at a depth within the borehole;
identifying a mismatch distance between the two or more images in the image log;
determining an acceleration of the downhole tool with at least one accelerometer;
determining an instantaneous velocity of the downhole tool with at least an average velocity of the downhole tool and a velocity deviation of the downhole tool, wherein the velocity deviation of the downhole tool is determined based at least on a cost function, wherein the cost function comprises the velocity deviation; and
calculating a depth of the downhole tool with at least the instantaneous velocity.
|