CPC C09K 8/5086 (2013.01) [E21B 33/138 (2013.01); C09K 2208/10 (2013.01)] | 4 Claims |
1. A wellbore in a subterranean formation, the wellbore comprising a wellbore zone having a gel that restricts flow of fluid from the subterranean formation into the wellbore at the wellbore zone, wherein the gel comprises zwitterionic gemini surfactant and silica nanoparticles, wherein the silica nanoparticles are formed in situ from orthosilicate catalyzed by an acid.
|