CPC H04W 76/12 (2018.02) [H04W 28/0268 (2013.01)] | 18 Claims |
1. A method of setting up a direct connection between edge sites on a 5G communications network, the method comprising the steps of:
configuring 5G network functions (NFs) in the 5G communications network;
configuring 5G NFs at the edge sites, if not already configured;
based on said configured 5G NFs in the 5G communications network and at the edge sites, setting up a direct tunnel between the edge sites according to a pre-defined tunnel policy; and
setting up a QoS connection on the direct tunnel between the edge sites by:
configuring QoS parameters on a Policy Control Function (PCF) and an Application Function (AF); and
configuring QoS parameters in 5G network entities along an end-to-end path through the direct tunnel between the edge sites.
|