CPC G05D 9/00 (2013.01) [B60P 1/00 (2013.01); B65G 67/04 (2013.01); G05D 9/12 (2013.01); A01B 69/001 (2013.01); A01B 69/004 (2013.01); A01D 41/1275 (2013.01); A01D 87/0038 (2013.01); A01D 90/02 (2013.01); B65G 67/24 (2013.01); G01F 22/00 (2013.01); G01F 23/292 (2013.01); G01G 19/10 (2013.01); G06F 7/70 (2013.01); G06T 7/62 (2017.01); G06T 15/08 (2013.01)] | 20 Claims |
1. A material loading system, comprising:
a receiving vehicle identification system that automatically identifies a receiving vehicle that receives material from a material loading vehicle;
a fill level detection system that automatically detects a fill level of the material in the identified receiving vehicle;
a fill data generation system that automatically generates a load count corresponding to the identified receiving vehicle, the load count being indicative of a number of times that the identified receiving vehicle has been filled with material during a load count window; and
an output generator that generates an output control signal to output the load count corresponding to the identified receiving vehicle.
|