CPC G05B 23/0283 (2013.01) [G06N 20/00 (2019.01); G06Q 10/06312 (2013.01); G06Q 10/0635 (2013.01); G06Q 10/20 (2013.01)] | 21 Claims |
1. A method for scheduling maintenance of equipment, the method comprising:
(a) developing, by a processor, one or more mathematical models, wherein the one or more mathematical models predict a failure time value associated with a future failure of a first component of equipment based on first component data associated with the first component;
(b) collecting, by a sensor monitoring the first component, pre-emptive maintenance data associated with a pre-emptive maintenance task associated with the first component,
wherein the pre-emptive maintenance data includes a flag configured to indicate an impending failure of the first component;
(c) collecting preventive maintenance data associated with a preventive maintenance task, wherein the preventive maintenance data comprises costs associated with replacing a second component prior to the preventive maintenance task;
(d) applying, by the processor, the one or more mathematical models to component data to predict the failure time value associated with the future failure of the first component;
(e) analyzing, by the processor, the pre-emptive maintenance data, the preventive maintenance data, and the failure time value to determine an optimal time to perform a maintenance event that includes the preventive maintenance task and the pre-emptive maintenance task; and
determining, by the processor, whether the flag indicates the impending failure of the first component;
upon determining the flag indicates impending failure of the first component, periodically repeat steps (a)-(e);
inputting, by the processor, the optimal time to a timetable system to schedule next maintenance event;
wherein determining the optimal time comprises minimizing a total cost of the maintenance.
|