1. A traffic control system comprising:
on-board control units installed on trains whose operations are managed by the traffic control system and that are traveling; and
an on-ground control unit installed on the ground,
wherein a respective one of the on-board control units:
is installed in each of the trains,
sets a driving path for the train provided with the on-board control unit based on a destination,
makes a route request for a route to turn back when the driving path is set in which the train provided with the on-board control unit performs a turning-back driving,
makes a route request for a branch route leading to the route to turn back when the route request for the route to turn back is made,
transmits information on the route requests to the on-ground control unit, and
controls driving of the train provided with the on-board control unit on the set driving path based on a traveling position and a traveling speed detected in the train provided with the on-board control unit, and
wherein the on-ground control unit:
controls a route of the train provided with the on-board control unit based on the transmitted information on the route requests.
|