| CPC E21B 47/11 (2020.05) [E21B 43/38 (2013.01); E21B 49/08 (2013.01)] | 20 Claims |

|
1. A method for quantitative downhole surveillance of a multi-phase flow in a hydrocarbon well, wherein the multi-phase flow comprises at least two phases, the well comprising at least one shunt chamber; wherein the at least one shunt chamber comprises:
a flow phase separation section;
at least one delay chamber;
a tracer releasing system for at least one tracer; and
at least one flow restrictor in fluid communication with the at least one delay chamber;
the method comprising:
separating flow in the shunt chamber into at least two phases;
releasing at least one tracer into the at least one delay chamber;
flushing out the flow with the at least one tracer from the shunt chamber into the production flow,
monitoring the at least one tracer in a production flow at a detection point downstream of the at least one shunt chamber;
measuring the concentration of the at least one tracer in a monitored flow.
|