| CPC H01M 8/1004 (2013.01) | 20 Claims |

|
1. A production plant for producing a membrane electrode assembly or a membrane electrode frame assembly having multiple work stations in which successive production steps take place,
characterized in that
a main line and at least one secondary line are provided, wherein the at least one secondary line branches off from the main line after a central work station and, after at least one decentralized work station in the respective secondary line, reenters the main line before the central work station, wherein the central work station comprises at least one work section for an adhesive application, and wherein at least some of the decentralized work stations are designed at least for joining and/or positioning other materials and/or layers.
|