US 12,454,867 B2
Integrated wellsite processing system and wellsite monitoring system and method of using same
Cameron Michael Bryant, Sugar Land, TX (US); James William Anthony, Missouri City, TX (US); David Chesney, Houston, TX (US); Roma Montifar, Katy, TX (US); Tyler Chaney, Rosharon, TX (US); Andres C Villareal, Duncanville, TX (US); David M Headley, Manvel, TX (US); Julio C. Guerrero, Cambridge, MA (US); and Jeffree Sea Dickinson, Sugar Land, TX (US)
Assigned to GR Energy Services Management, LP, Sugar Land, TX (US)
Appl. No. 18/271,444
Filed by GR Energy Services Management, LP, Sugar Land, TX (US)
PCT Filed Jan. 9, 2022, PCT No. PCT/US2022/011740
§ 371(c)(1), (2) Date Jul. 7, 2023,
PCT Pub. No. WO2022/150672, PCT Pub. Date Jul. 14, 2022.
Claims priority of provisional application 63/135,610, filed on Jan. 9, 2021.
Prior Publication US 2024/0060369 A1, Feb. 22, 2024
Int. Cl. E21B 19/16 (2006.01)
CPC E21B 19/165 (2013.01) [E21B 19/161 (2013.01)] 22 Claims
OG exemplary drawing
 
22. A method of processing downhole tools for use at a wellsite, the method comprising:
assembling a downhole tool by:
passing portions of the downhole tool along an assembly conveyor and into a gun builder; and
threadedly connecting the portions of the downhole tool using the gun builder;
passing the downhole tool from the gun builder to a tool lift by passing the downhole tool from the assembly conveyor to the tool lift via a tool stager;
lifting the downhole tool at an angle using the tool lift; and
transporting the downhole tool from the tool lift to locations about the wellsite.