CPC E04B 1/34869 (2013.01) [E04B 1/34861 (2013.01); E04H 5/02 (2013.01)] | 9 Claims |
1. A plant construction module for a plant configured to process a fluid, the plant construction module comprising:
a plant structural part including:
at least one pipe structural part, serving as at least one piping through which the fluid flows;
a processing-unit structural part, serving as a processing unit configured to process the fluid to be transferred into/from the processing unit through the at least one piping; or
a reservoir structural part, serving as a reservoir configured to reserve the fluid; and
a frame unit, which is configured to support the plant structural part, and has a contour enabling the frame unit to be arranged in a horizontal direction, or to be stacked in an up-and-down direction,
wherein the plant structural part and the frame unit are integrally formed as an integrated structure, and
an end portion of the pipe structural part is arranged at a predetermined position for connecting with an end portion of a pipe structural part of another plant construction module.
|