US 11,795,682 B2
Plant construction module, plant, manufacturing method for plant construction module, and plant construction method
Hiroteru Igarashi, Kanagawa (JP); Atsuo Honiden, Kanagawa (JP); and Noriaki Terakubo, Kanagawa (JP)
Assigned to JGC CORPORATION, Kanagawa (JP)
Appl. No. 17/428,271
Filed by JGC CORPORATION, Kanagawa (JP)
PCT Filed Jun. 3, 2019, PCT No. PCT/JP2019/021957
§ 371(c)(1), (2) Date Aug. 3, 2021,
PCT Pub. No. WO2020/245868, PCT Pub. Date Dec. 10, 2020.
Prior Publication US 2022/0106784 A1, Apr. 7, 2022
Int. Cl. E04B 1/348 (2006.01); E04H 5/02 (2006.01)
CPC E04B 1/34869 (2013.01) [E04B 1/34861 (2013.01); E04H 5/02 (2013.01)] 9 Claims
OG exemplary drawing
 
1. A plant construction module for a plant configured to process a fluid, the plant construction module comprising:
a plant structural part including:
at least one pipe structural part, serving as at least one piping through which the fluid flows;
a processing-unit structural part, serving as a processing unit configured to process the fluid to be transferred into/from the processing unit through the at least one piping; or
a reservoir structural part, serving as a reservoir configured to reserve the fluid; and
a frame unit, which is configured to support the plant structural part, and has a contour enabling the frame unit to be arranged in a horizontal direction, or to be stacked in an up-and-down direction,
wherein the plant structural part and the frame unit are integrally formed as an integrated structure, and
an end portion of the pipe structural part is arranged at a predetermined position for connecting with an end portion of a pipe structural part of another plant construction module.