US 12,451,673 B2
Platform microgrid
Robert A. Soverns, Pendleton, IN (US); and Alex S. Creviston, Muncie, IN (US)
Assigned to GO ELECTRIC INC., Anderson, IN (US)
Filed by GO ELECTRIC, INC., Anderson, IN (US)
Filed on May 27, 2022, as Appl. No. 17/827,411.
Claims priority of provisional application 63/194,964, filed on May 29, 2021.
Prior Publication US 2022/0385046 A1, Dec. 1, 2022
Int. Cl. B60L 53/30 (2019.01); H02B 1/01 (2006.01); H02B 5/00 (2006.01); H02S 40/32 (2014.01); B60L 53/51 (2019.01); H02S 20/23 (2014.01)
CPC H02B 5/00 (2013.01) [H02B 1/011 (2013.01); H02S 40/32 (2014.12); B60L 53/30 (2019.02); B60L 53/51 (2019.02); H02S 20/23 (2014.12)] 27 Claims
OG exemplary drawing
 
1. A platform microgrid system, comprising:
a platform skid for mounting of microgrid system equipment; and
a microgrid operations system comprising:
a microgrid control system supported by the platform skid, the microgrid control system comprising microgrid system equipment for conducting microgrid operations including at least one processor for executing instructions stored in memory, and microgrid circuitry for facilitating microgrid operations according to the processor; and
a power delivery system supported by the platform skid, the power delivery system arranged in communication with the microgrid control system to provide electrical power to a load bus,
the platform skid comprising an intermodal container configured for housing a power storage device in communication to provide power to the power delivery system, wherein the intermodal container is integrated as a portion of support structure of the platform skid.