| CPC F03D 7/048 (2013.01) [F03D 7/0284 (2013.01); G01R 19/2513 (2013.01); F05B 2270/1033 (2013.01); F05B 2270/337 (2013.01); F05B 2270/709 (2013.01)] | 14 Claims |

|
1. A method of predicting a frequency value of a utility grid to which a wind park is connected and controlling operation of the utility grid and/or the wind park, the method comprising:
obtaining plural utility grid measurement values pertaining to a predetermined time range before and until a present point in time;
obtaining plural wind park measurement values pertaining to the predetermined time range;
feeding the plural utility grid measurement values and the plural wind park measurement values into a recurrent neural network trained to output a predicted frequency value at at least one next point in time, the next point in time being between 0.5 s and 2 s after the present point in time, wherein the plural utility grid measurement values contain a, across the time range, time series of values of the grid frequency as measured at one or more locations and/or a grid voltage as measured at the one or more locations; and
controlling operation of the utility grid and/or the wind park using the predicted frequency value.
|