| CPC F02D 41/22 (2013.01) [F02B 63/04 (2013.01); F02D 2200/0625 (2013.01); F02D 2200/503 (2013.01)] | 20 Claims |

|
1. A method for generating power by bringing a plurality of generators online using a sequencing order and an energy storage module (“ESM”), the ESM comprising one or more batteries and a controller configured to be operably coupled to each of the plurality of generators, each of the plurality of generators comprising an engine associated with a plurality of engine sensors, engine specification data, and baseline performance data, and the method comprising:
(a) accessing, using the controller, engine specification data and baseline performance data associated with a selected engine of one of the plurality of generators, wherein the selected engine is a first engine of a first generator of the plurality of generators;
(b) initiating, using the controller and the one or more batteries, a load step on the selected engine, the load step being based on the engine specification data associated with the selected engine;
(c) receiving, by the controller and from a plurality of sensors associated with the selected engine, data associated with a response of the selected engine to the load step of step (b);
(d) comparing, using the controller, the data of step (c) to the baseline performance data associated with the selected engine;
(e) calculating, using the controller and based on the comparison of step (d), an engine performance score associated with a performance of the selected engine, wherein the engine performance score calculated for the selected engine is a first engine performance score associated with a performance of the first engine;
(f) storing, using the controller, the engine performance score of step (e) in a database associated with the controller;
(g) selecting, using the controller, a second engine of a second generator of the plurality of generators such that the second engine is the selected engine;
(h) executing steps (a)-(f) with the second engine being the selected engine such that the engine performance score calculated for the selected engine is a first engine performance score associated with a performance of the second engine;
(i) comparing, using the controller, the first engine performance score associated with the performance of the first engine and the first engine performance score associated with the performance of the second engine;
(j) creating, using the controller and based on the comparison of step (i), a sequencing order defining the order in which the first generator and the second generator will be brought online to generate power; and
(k) generating power by bringing online, using the controller, the first generator and the second generator based on the sequencing order.
|