CPC G08G 1/08 (2013.01) [G08G 1/0125 (2013.01)] | 20 Claims |
1. A method for tidal lane opening management in a smart city, which is applied to a management platform, comprising:
issuing a data obtaining instruction to a sensor network platform to obtain a first traffic feature of a target road within a first time period from an object platform through the sensor network platform, wherein the first traffic feature is a feature reflecting a flow situation of the target road;
determining a target tidal lane opening scheme of the target road within the first time period based on the first traffic feature using a preset algorithm, wherein the target tidal lane opening scheme is a scheme for managing an opening time of a tidal lane, a flow direction of the tidal lane, and a number of tidal lanes for the target road;
generating a scheme execution instruction based on the target tidal lane opening scheme, sending the scheme execution instruction to the object platform through the sensor network platform, the object platform configured to control the target road based on the scheme execution instruction; and
issuing a data upload instruction to send the target tidal lane opening scheme to a user platform through a service platform, the user platform configured for a user to consult opening information of the tidal lane.
|