CPC E21B 43/013 (2013.01) [E21B 43/01 (2013.01); E21B 43/36 (2013.01); E21B 41/0099 (2020.05)] | 5 Claims |
1. A methane production assembly comprising:
a subsea well extending from the seabed to a methane hydrate formation;
a well casing extending into the subsea well;
a subsea well control assembly;
a submersible pump in fluid communication with the methane hydrate formation;
a methane-water separator having a water outlet and a methane outlet;
wherein the submersible pump is arranged above the subsea well;
a riser extending from a surface installation down to the subsea well control assembly; and
wherein the methane-water separator is integrated with a riser joint.
|