CPC E04B 1/6815 (2013.01) [E04B 1/6812 (2013.01); E04B 1/82 (2013.01); E04B 1/946 (2013.01); E04B 1/948 (2013.01)] | 9 Claims |
1. A method for installing a wall configuration to a fluted metal deck with corrugations, wherein the wall configuration comprises a ceiling runner being mounted on a lower side of the fluted metal deck, the method comprising:
inserting one or more of a sealing element and/or one or more seals comprising the sealing element and a carrier strip into at least one of the corrugations of the fluted metal deck according to a track of the wall configuration, and
subsequently mounting the ceiling runner and/or a top track seal to the track of the wall configuration with the inserted one or more of the sealing element and/or one or more seals,
wherein the sealing element is a sealing element for sealing a corrugation of a fluted metal deck, having a shape and volume adapted to seal the corrugation between adjacent fluted deck elements or in one of the fluted deck elements, wherein the sealing element is moldable and self-adhesive.
|