US 12,115,660 B2
Cable status management system
Hideki Nonen, Tokyo (JP); Izumi Fukasaku, Tokyo (JP); Ayano Kato, Tokyo (JP); Kei Nishimura, Hitachi (JP); Takahiro Sugiyama, Tokyo (JP); Noriyuki Imai, Tokyo (JP); and Takahiro Sato, Tokyo (JP)
Assigned to PROTERIAL, Ltd., Tokyo (JP)
Filed by Hitachi Metals, Ltd., Tokyo (JP)
Filed on Jun. 7, 2022, as Appl. No. 17/834,168.
Claims priority of application No. 2021-152404 (JP), filed on Sep. 17, 2021; and application No. 2022-064007 (JP), filed on Apr. 7, 2022.
Prior Publication US 2023/0090896 A1, Mar. 23, 2023
Int. Cl. B25J 19/00 (2006.01); H01B 7/32 (2006.01)
CPC B25J 19/00 (2013.01) [H01B 7/32 (2013.01)] 9 Claims
OG exemplary drawing
 
1. A cable status management system for managing a wire-break progress of a cable used in a managed device, comprising:
a cable status management device having a cable status storage unit that stores a wire-break progress data indicating the wire-break progress of the cable;
a device user-side data management device of a device user that uses the managed device;
a device manufacturer terminal of a device manufacturer that manufactures the managed device; and
a cable manufacturer terminal of a cable manufacturer that manufactures the cable,
wherein at least the device manufacturer terminal and the cable manufacturer terminal are configured to be accessible with the wire-break progress data stored in the cable status storage unit via a network.