CPC H05K 7/203 (2013.01) [B23P 15/26 (2013.01); H05K 7/20318 (2013.01); H05K 7/20327 (2013.01)] | 16 Claims |
1. A method of converting a pre-modification immersive cooling system to a post-modification immersive cooling system, the pre-modification immersive cooling system configured to flow a cooled portion of an operating fluid into a reservoir from above the reservoir, the method comprising:
modifying a structure of the pre-modification immersive cooling system such that a cooled portion of a substitute operating fluid flows into the reservoir from a direction other than above the reservoir; and
using a high boiling point operating fluid as the substitute operating fluid.
|