| CPC H04W 60/04 (2013.01) [H04W 48/16 (2013.01); H04W 48/20 (2013.01); H04W 88/085 (2013.01)] | 18 Claims |

|
1. A method for operating a first base station for configuration of a first notification area, wherein first base station comprises a first central unit (CU) and one or more first distributed units (DU) controlled by the first CU, the method comprising:
receiving first information identifying a notification area update from a second base station comprising a second CU and one or more second DUs controlled by the second CU,
wherein said first information is based on a message identifying a notification area update procedure obtained in one of said second DUs from a user equipment (UE) being configured with a first notification area comprising the first base station;
establishing a connection between said first CU and said one second DU; and
configuring the UE with second information identifying an addition of said one second DU to said first notification area.
|