| CPC G06F 9/5055 (2013.01) [G06F 9/5044 (2013.01); G06F 9/5077 (2013.01)] | 20 Claims |

|
1. An information handling system, comprising:
a plurality of processing nodes;
a compute express link (CXL) switch;
a plurality of CXL devices; and
a workload orchestrator configured to receive a first workload to be instantiated on a first one of the processing nodes, to determine a first set of resources associated with the first workload, to select a first one of the CXL devices to be used based upon the first set or resources, and to launch the first workload on the first processing node.
|