| CPC G05B 19/4185 (2013.01) [G05B 19/4183 (2013.01)] | 19 Claims |

|
1. A method performed by a sensor control system for managing at least a first set of one or more sensors for monitoring a first domain of an industrial process and a second set of one or more sensors for monitoring a second domain of the industrial process, wherein the sensor control system comprises at least a first reinforcement learning (RL) agent and a second RL agent, wherein the first and second RL agents were trained using reinforcement learning and a process graph representing the industrial process, the method comprising:
the sensor control system receiving sensor data from the first set of one or more sensors;
the sensor control system using the received sensor data and the process graph to decide whether or not to reconfigure the first set of sensors and/or the second set of sensors; and
the sensor control system providing configuration information to the first set of sensors and/or the second set of sensors as a result of the sensor control system deciding to reconfigure the first set of sensors and/or the second set of sensors,
wherein the first and second domains are defined based on sensor locations; or
wherein the first and second domains are defined based on functional similarities.
|