| CPC F03G 4/026 (2021.08) [B01D 53/62 (2013.01); E21B 41/0064 (2013.01); F03G 4/02 (2021.08); F03G 4/069 (2021.08); F24T 10/20 (2018.05); F24T 50/00 (2018.05); B01D 2257/504 (2013.01)] | 17 Claims |

|
17. A combined energy production and carbon dioxide mineralization installation, comprising:
a recovery unit configured to recover heat power from a geothermal fluid emitted at a hydrothermal active site at the bottom of a body of water;
a conversion unit configured to convert the recovered heat power into electricity in the body of water or at the surface of the body of water;
at least an equipment powered with the electricity obtained from the conversion unit; and
an injection unit configured to simultaneously inject a carbon dioxide containing stream in a ground formation at a carbon dioxide injection site next to the hydrothermal active site to carry out a carbonation of the carbon dioxide in the ground formation, wherein the carbonation of the carbon dioxide produces a solid attached to the ground formation.
|