CPC G05B 13/04 (2013.01) [G05B 15/02 (2013.01); G05B 2219/25011 (2013.01); G05B 2219/2642 (2013.01)] | 20 Claims |
1. A building system of a building comprising one or more non-transitory storage media having instructions stored thereon that, when executed by one or more processors, cause the one or more processors to:
generate a graphic building interface based on a graphic building model of the building and a plurality of pieces of building equipment, wherein the graphic building interface comprises a plurality of graphic objects representing the plurality of pieces of building equipment within a graphic representation of the building;
generate a plurality of mappings between a plurality of points of the plurality of pieces of building equipment and the plurality of graphic objects of the graphic building model of the building, the plurality of graphic objects representing the plurality of pieces of building equipment, wherein the plurality of mappings map a point of the plurality of points of a piece of building equipment of the plurality of pieces of building equipment with a graphic object of the piece of building equipment of the plurality of graphic objects;
update the graphic object, by adding, using at least one mapping of the plurality of mappings, an identifier of the point into an attribute of a plurality of attributes for the graphic object;
generate, using the identifier stored in the attribute of the graphic object, an alarm for the piece of building equipment based on one or more values of the point of the plurality of points;
generate a work order for the piece of building equipment based on the alarm; and
cause the graphic building interface to include a representation of the work order for the piece of building equipment within the graphic building interface.
|