CPC E21B 43/123 (2013.01) | 20 Claims |
1. A gas lift system for improving the recovery of petroleum fluids from a well to the surface through production tubing, the gas lift system comprising:
a packer, wherein the production tubing extends through the packer;
a lower injection mandrel connected to the production tubing, wherein the lower injection mandrel is located below the packer;
an injection line that carries pressurized gas from the surface to the lower injection mandrel; and
an injection line gas lift valve assembly connected within the injection line, wherein the injection line gas lift valve assembly comprises:
a seating module; and
a flow metering device removably captured within the seating module.
|