CPC E21B 33/13 (2013.01) [E21B 34/14 (2013.01); E21B 2200/06 (2020.05)] | 18 Claims |
1. A method comprising:
retracting a retractable segment of a tubular control conduit disposed in a wellbore leaving an abandoned segment of the tubular control conduit, each of the retractable segment and the abandoned segment having an inner bore, and the abandoned segment comprises a chamber in fluidic communication with the inner bore and the chamber comprises a swellable material;
actuating an obstruction member comprising a swellable material by contacting the swellable material with an actuating fluid thereby swelling the swellable material, the obstruction member forming a seal and preventing a flow of fluid past the obstruction member out from the inner bore of the abandoned segment upon actuation;
introducing cement into the wellbore after retracting the retractable segment of the tubular control conduit to cover the abandoned segment of the tubular control conduit.
|