CPC E21B 17/05 (2013.01) [E21B 17/028 (2013.01); E21B 47/135 (2020.05)] | 19 Claims |
11. A method of forming a completion in a wellbore, the method comprising:
deploying a lower completion stage in a wellbore downhole of a packer, the lower completion stage comprising a receptacle, wherein the receptacle comprises:
a first alignment feature and a second alignment feature, wherein the second alignment feature comprises a first alignment key and a second alignment key; and
a first communication line connector disposed between the first alignment key and the second alignment key;
inserting a portion of a stinger of an upper completion stage through the packer and into the receptacle, wherein the stinger comprises:
a third alignment feature and a fourth alignment feature, wherein the fourth alignment feature comprises a first slot and a second slot; and
a second communication line connector, wherein the second communication line connector is disposed between the first slot and the second slot;
aligning the first communication line connector with the second communication line connector, wherein aligning the first communication line connector with the second communication line connector comprises engaging the first alignment feature with the third alignment feature and engaging the second alignment feature with the fourth alignment feature; and
coupling the first and second communication line connectors after aligning the first communication line connector with the second communication line connector.
|