CPC E01B 27/17 (2013.01) [E01B 27/026 (2013.01); E01B 29/04 (2013.01); E01B 2203/10 (2013.01); E01B 2203/12 (2013.01)] | 9 Claims |
1. A method for treatment of a ballast track by means of track maintenance machine which comprises:
a lifting unit comprising:
gripping rollers coupled to the lifting unit for gripping a track grid formed of rails and sleepers;
lifting drives for lifting the track grid; and
lining drives by means of which the track grid is aligned, and that during a lining operation the vibration of the lifting unit is reduced;
a measuring system for comparing to a target position of the track,
a vibration exciter wherein the lifting unit is set in vibration by means of said vibration exciter and the vibration is transmitted to the track grid;
a control device wherein the lifting unit is controlled by means of said control device in such a way that, during a lifting operation, the lifting unit is set in vibration, and the track grid is first lifted to above the target position and subsequently lowered to the target position.
|