CPC G06V 10/82 (2022.01) [G06F 18/24 (2023.01); G06V 10/764 (2022.01); G06V 20/13 (2022.01); G06V 20/17 (2022.01); G06V 20/20 (2022.01); G06V 20/35 (2022.01); G06V 20/52 (2022.01); G05B 9/02 (2013.01)] | 26 Claims |
1. A computer-implemented method for determining and providing a safety risk analysis for construction, comprising:
obtaining construction related data, wherein the construction related data comprises textual data for a construction project and a visual artifact for the construction project;
identifying an issue with a potential safety issue based on the construction related data;
identifying a construction safety context for the issue based on the construction related data, wherein the construction safety context comprises a classification of the issue into a safety related class of issue;
based on the construction safety context, determining a safety participant risk score that assigns a numerical safety risk participant value to any entity involved in the construction project;
based on the safety risk participant score, determining a safety project score that assigns a risk level on a per-project basis; and
presenting the safety risk analysis, based on the safety participant risk score and safety project score, via a graphical user interface.
|
14. A computer-implemented system for determining and providing a safety risk analysis for construction, comprising:
(a) a computer having a memory;
(b) a processor executing on the computer;
(c) the memory storing an application that is executed by the processor, causing the application to:
(i) obtain construction related data, wherein the construction related data comprises textual data for a construction project and a visual artifact for the construction project;
(ii) identify an issue with a potential safety issue based on the construction related data;
(iii) identify a construction safety context for the issue based on the construction related data, wherein the construction safety context comprises a classification of the issue into a safety related class of issue;
(iv) based on the construction safety context, determine a safety participant risk score that assigns a numerical safety risk participant value to any entity involved in the construction project;
(v) based on the safety risk participant score, determine a safety project score that assigns a risk level on a per-project basis; and
(vi) present the safety risk analysis, based on the safety participant risk score and safety project score, via a graphical user interface.
|