CPC G01R 31/367 (2019.01) [G01R 31/382 (2019.01); G01R 31/392 (2019.01); G01R 31/396 (2019.01); H01M 10/425 (2013.01); H01M 10/443 (2013.01); H01M 10/48 (2013.01); H01M 10/486 (2013.01); H02J 7/00032 (2020.01); H02J 7/0047 (2013.01); H02J 7/0048 (2020.01); H02J 7/005 (2020.01); H02J 7/04 (2013.01); H01M 2010/4271 (2013.01); H01M 2220/20 (2013.01)] | 20 Claims |
1. A method for active battery management, comprising steps of:
providing signal injections for charging or discharging of a battery, including charging of the battery from a power grid;
receiving response signals corresponding with the signal injections;
measuring a utility of the response signals;
accessing data relating to charging or discharging of the battery, including discharging the battery into the power grid in exchange for an economic benefit; and
modifying the data based upon the utility of the response signals.
|