CPC F24F 11/47 (2018.01) [F24F 11/62 (2018.01); F24F 11/77 (2018.01); F24F 11/86 (2018.01); G05B 13/048 (2013.01); G06Q 30/0206 (2013.01); G06Q 50/06 (2013.01); F24F 2005/0067 (2013.01)] | 20 Claims |
1. A predictive controller for building equipment associated with a building, the predictive controller comprising one or more processing circuits configured to:
control electric energy used by the building equipment, the building equipment comprising an electric energy using component; and
use a predictive cost function to determine a first amount of the electric energy supplied from an energy grid source and a second amount of the electric energy supplied from a second energy source to the electric energy using component.
|