CPC C22C 38/14 (2013.01) [C21D 8/0205 (2013.01); C21D 8/0226 (2013.01); C21D 8/0236 (2013.01); C21D 9/46 (2013.01); C21D 9/68 (2013.01); C21D 11/00 (2013.01); C22C 38/02 (2013.01); C22C 38/04 (2013.01); C22C 38/06 (2013.01); C23C 2/0038 (2022.08); C23C 2/02 (2013.01); C23C 2/022 (2022.08); C23C 2/06 (2013.01); C23C 2/20 (2013.01); C21D 2211/002 (2013.01)] | 13 Claims |
1. A method for manufacturing a cold-rolled dual-phase steel plate having a strength of at least 980 MPa, wherein a slab is directly transferred to be cold rolled after hot rolling, coiling, bundling, and on-line thermal insulation, and then subjected to continuous annealing to obtain a cold rolled dual-phase steel plate; wherein a coiling temperature is controlled at 450° C. or higher; wherein the online thermal insulation means that each hot-rolled coil is covered with an independent and airtight thermal insulation enclosure within 30 minutes after unloading the coil, and transferred to be cold rolled; wherein a thermal insulation temperature of the hot-rolled coil in the thermal insulation enclosure is 450° C. or higher, and a thermal insulation time is within 20 hours; wherein an electric heating device and a temperature sensor are provided in the thermal insulation enclosure.
|