US 12,731,985 B2
Power clamp circuit and electronic device including power clamp circuit
Gyu Nam Kim, Icheon-si (KR)
Assigned to SK hynix Inc., Icheon-si (KR)
Filed by SK hynix Inc., Icheon-si (KR)
Filed on Apr. 1, 2024, as Appl. No. 18/623,509.
Application 18/623,509 is a continuation in part of application No. 18/607,098, filed on Mar. 15, 2024.
Claims priority of application No. 10-2023-0125145 (KR), filed on Sep. 19, 2023.
Prior Publication US 2025/0096559 A1, Mar. 20, 2025
Int. Cl. H02H 9/04 (2006.01); H03K 17/687 (2006.01)
CPC H02H 9/046 (2013.01) [H03K 17/6871 (2013.01)] 19 Claims
OG exemplary drawing
 
1. A power clamp circuit comprising:
an electro-static discharge (ESD) current discharge circuit including a first MOS transistor, a second MOS transistor, and a third MOS transistor that are coupled in series between a first power rail coupled to a supply voltage and a second power rail coupled to a ground voltage;
a voltage branch circuit configured to provide a first branch voltage and a second branch voltage,
a first triggering circuit including a first resistor, a first capacitor, and a fourth MOS transistor and configured to trigger the first MOS transistor;
a second triggering circuit including a second resistor, a second capacitor, and a fifth MOS transistor and configured to trigger the second MOS transistor; and
a third triggering circuit including a third resistor and a third capacitor, and configured to turn off the third MOS transistor during a normal operation and to turn on the third MOS transistor when an ESD event occurs,
wherein the first triggering circuit is configured to provide the first branch voltage generated by the voltage branch circuit to a gate of the first MOS transistor,
wherein the second triggering circuit is configured to provide the second branch voltage generated by the voltage branch circuit to a gate of the second MOS transistor, and
wherein the voltage branch circuit is configured to provide the first branch voltage of at least 60% of a voltage applied to the first power rail, and to provide the second branch voltage of at least 30% of a voltage applied to the first power rail.