| CPC G06T 3/40 (2013.01) [G06T 11/206 (2013.01); G06T 11/60 (2013.01); G06T 2210/36 (2013.01); G08B 21/00 (2013.01)] | 18 Claims |

|
1. A method for generating a zoomable diagram of an industrial plant for an analysis of an alarm, the method comprising:
providing a topology diagram of at least a part of the industrial plant for interacting with components of the industrial plant, wherein the topology diagram comprises a plurality of objects, each of the plurality of objects representing a component of the industrial plant, and a plurality of connections, each of the plurality of connections representing a logical and/or a physical connection between at least two of the components;
generating, for each zoom-level of the zoomable diagram, a zoomed diagram comprising a zoomed view of each one of the plurality of objects and the plurality of connections, wherein a zoomed view is generated by applying rules to each object, the rules including, for a zoomed diagram having a plurality of zoom-levels:
from a first predefined zoom-level, collapse all objects of a plant-segment to one object and keep only connections that cross the plant-segment's border; and
introduce a plant-segment related alarm measure as a function of all alarm statuses of the plurality of objects of the plant-segment, and, when a scaled-down object is smaller than a predefined size, hide the scaled-down object based on a rank-stage of the object type, wherein the rank-stage comprises an association to a respective component of the industrial plant and a hiding priority relative to other components of the industrial plant;
storing the zoomed diagram for each of the plurality of zoom-levels; and
when interacting with the components of the industrial plant by utilizing the plurality of zoomable diagrams,
determining, for each plant-segment, the plant-segment related alarm measure, and
outputting the plant-segment related alarm measure for healing a cause of the alarm.
|