| CPC G06Q 10/0631 (2013.01) | 13 Claims |

|
1. A system comprising:
a metering device, including a distributed energy resource (DER) port, configured to meter resource generation by one or more DER components;
a smart panel configured to control application of power to a plurality of devices;
a processor; and
a non-transitory, computer-readable memory that includes instructions executable by the processor for causing the processor to:
access a peak resource management schedule;
receive a peak resource management signal comprising instructions to commence execution of the peak resource management schedule at a premises;
control the metering device to monitor premises resource consumption at the premises;
determine that a peak resource consumption portion of the peak resource management schedule is active;
in response to determining that the peak resource consumption portion is active, control the premises resource consumption at the premises to an amount that is less than a peak resource consumption level of the peak resource management schedule, the controlling the premises resource consumption at the premises comprising controlling the application of power by the smart panel to the plurality of devices;
determine that a limited resource consumption portion of the peak resource management schedule is active; and
in response to determining that the limited resource consumption portion is active, control the premises resource consumption at the premises to an amount that is less than a non-zero, limited resource consumption level of the peak resource management schedule.
|