| CPC G06F 13/4282 (2013.01) [G06F 2213/0026 (2013.01); G06F 2213/0042 (2013.01)] | 20 Claims |

|
1. A management system, comprising:
at least one processor;
a baseboard management controller (BMC), wherein a data bus for data transmission is situated between the at least one processor and the BMC; and
one or more memories, wherein the one or more memories store first programming instructions for execution by the at least one processor to:
convert a first protocol packet comprising first management data of the management system into a second protocol packet; and
send the second protocol packet through the data bus, wherein a protocol type of the second protocol packet is a transmission protocol type of the data bus, a protocol type of the first protocol packet is different from the protocol type of the second protocol packet, and a transmission rate of the first protocol packet is lower than a transmission rate of the second protocol packet; and
wherein the BMC is configured to:
receive the second protocol packet from the data bus based on a first instruction;
convert a fourth protocol packet comprising second management data of the management system into a fifth protocol packet; and
send the fifth protocol packet through the data bus, wherein a protocol type of the fourth protocol packet is different from a protocol type of the fifth protocol packet, and a transmission rate of the fourth protocol packet is lower than a transmission rate of the fifth protocol packet.
|