CPC H04W 72/0453 (2013.01) [H04W 72/12 (2013.01); H04W 72/23 (2023.01)] | 18 Claims |
1. An apparatus of a user equipment (UE) comprising:
one or more processors; and
a memory storing instructions that, when executed by the one or more processors, configure the apparatus to:
generate a message to send to a base station, the message comprising an indication of the UE's capability for cross carrier scheduling (CCS) with different sub-carrier spacing (SCS), wherein the indication comprises support for processing a list of possible combinations of unicast downlink (DL)-scheduling DCI and unicast uplink (UL)-scheduling downlink control information (DCI) per monitoring occasion per span, wherein each of the possible combinations is generated based on both a first number representing a total maximum sum of unicast DL-scheduling DCI and unicast UL-scheduling DCI and a second number representing a maximum number of unicast DL-scheduling DCI or unicast UL-scheduling DCI;
based on the UE's capability for CCS with different SCS, process a number of unicast DCI per physical downlink control channel (PDCCH) monitoring occasion per span to determine scheduled resources for DL and UL signaling or channels; and
process the DL and UL signaling or channels using the scheduled resources.
|