US 12,081,010 B2
Substation frame
Bin Ma, Nantong (CN); and Aoyun Zhuang, Nantong (CN)
Assigned to JIANGSU SHEMAR ELECTRIC CO., LTD., Nantong (CN)
Appl. No. 17/612,516
Filed by JIANGSU SHEMAR ELECTRIC CO., LTD., Nantong (CN)
PCT Filed Aug. 6, 2021, PCT No. PCT/CN2021/111272
§ 371(c)(1), (2) Date Nov. 18, 2021,
PCT Pub. No. WO2022/042263, PCT Pub. Date Mar. 3, 2022.
Claims priority of application No. 202010897246.9 (CN), filed on Aug. 31, 2020.
Prior Publication US 2023/0089437 A1, Mar. 23, 2023
Int. Cl. H02G 7/20 (2006.01); E04H 12/08 (2006.01); H01B 17/10 (2006.01); H02B 5/00 (2006.01); H02G 7/05 (2006.01)
CPC H02G 7/20 (2013.01) [E04H 12/08 (2013.01); H01B 17/10 (2013.01); H02B 5/00 (2013.01); H02G 7/05 (2013.01)] 20 Claims
OG exemplary drawing
 
1. A substation frame comprising:
a supporting assembly including at least two supporting posts arranged at intervals, the at least two supporting posts including one side supporting post at each end;
a beam assembly including a beam provided between every two adjacent supporting posts; and
a side wire attaching assembly provided on at least one side supporting post and positioned on a side of the side supporting post facing away from the beam;
wherein the beam is made of composite insulating material, and a position on the beam between the two supporting posts is capable of being directly configured as a wire attaching point; and
wherein at least one of the supporting posts includes a first supporting part and a second supporting part that are connected to each other, the first supporting part is located between the beam and the second supporting part, the first supporting part is made of composite insulating material, the second supporting part is made of metal material, and a connection between the first supporting part and the beam assembly is capable of being directly configured as a wire attaching point.