CPC E21B 43/10 (2013.01) [E21B 23/06 (2013.01); E21B 33/1208 (2013.01); E21B 34/063 (2013.01); E21B 34/142 (2020.05); E21B 2200/04 (2020.05)] | 23 Claims |
1. A completion string deployed in a wellbore extending through a plurality of well zones, the completion string comprising:
at least one isolation packer positioned between well zones of the plurality of well zones, the plurality of well zones comprising: a bottom-most well zone; and a top well zone;
a washdown shoe disposed in the bottom-most well zone;
a first sand control assembly and a first circulating assembly, each disposed uphole of the washdown shoe in the bottom-most well zone;
wherein the top well zone comprises a return valve assembly and a production packer,
wherein the top well zone further comprises a second sand control assembly; and a second circulating assembly, each of the second sand control assembly and the second circulating assembly being downhole of the production packer,
wherein the completion string further comprises:
an outer string spanning from the bottom-most well zone to the top well zone; and
an inner production string concentrically arranged within the outer string creating an inner-annulus between the outer string and the inner production string, wherein the inner-annulus is continuous from the washdown shoe to the return valve assembly, the inner production string comprising: a first production valve disposed between the first sand control assembly and the first circulating assembly in the bottom-most well zone; and a second production valve disposed between the second sand control assembly and the second circulating assembly in the top well zone.
|